Wednesday, October 26, 2011

baby steps

After the big push on the weekend we put in the floors counter and sink we were exhausted.  We kind of slowed down the pace.

Over the week Steve cut and glued the rest of the wood for the doors. We had a few issues with wood bending or moving as the glue dried despite 6 clamps on each door. So we filled the cracks with spackle and sanded the uneven spots down.  

Then over the weekend we primed the doors.  The only other project that got done on the Kitchen this past weekend was Steve finishing the floor in the closet.  
It was a gorgeous weekend so we spent a lot of time outside raking leaves and chasing Everett around the yard. We also discovered that we think we had(have) grubs. Grubs turn into Beetles right? Well our yard is crawling with big yucky Beetles, patches of dead grass, and little mounds with holes where I assume the icky things crawled out from the ground. Boo. Now we have to figure out how  and when to handle that problem.

Anyway during the week we have been slowly putting paint on the cabinet doors one coat at a time, one side at a time. Maybe they will be done by the weekend.